Using sample_shift.csv, write the quality part of my end-of-shift report in four short lines: parts made, parts out of spec (how many, and the first one: part number and time), when the sizes started to change (part number and time), and what to check on the machine. The target is 22.00 mm, and the limits are 21.98 and 22.02 mm. Count from the file. Do not guess.